更新时间:2020-06-29 11:38:57
封面
版权信息
Brief Introduction of the Book
Preface
Foreword
1 Overview of Structure for CRTSⅠ Slab Ballastless Track
1.1 CRTSⅠ Track Structure on Bridge
1.2 CRTSⅠ Track Structure on Subgrade
1.3 CRTSⅠ Track Structure in Tunnel
1.4 Transition Design for TypeⅠ and TypeⅡ Track System on Subgrade
1.5 Transition Design for TypeⅠ Ballast and Ballastless Track System on Bridge
1.6 Construction Process Flow of CRTSⅠ Slab Ballastless Track
2 Prefabrication Production of CRTSⅠ Track Slab
2.1 Basic Structure of Slab Yard
2.2 Facility & Tooling Configuration
2.3 Labor Force Organization
2.4 Work Flow for CRTSⅠ Track Slab
2.5 Production Process and Quality Control for CRTSⅠ Track Slab
2.6 Quality Control
3 Pedestal Foundation Treatment
3.1 Beam Surface Treatment
3.2 Subgrade Surface Construction,Acceptance and Delivery
3.3 Quality Control
4 Bed Plate and Convex Blocking Mound Construction on Bridge
4.1 Rebar and Formwork Works
4.2 Concrete Pouring and Curing
4.3 Quality Control
5 Construction of Pedestal Plate and Convex Blocking Mound on Subgrade and in Tunnel
5.1 Construction of Pedestal Plate and Convex Blocking Mound on Subgrade
5.2 Construction of Pedestal Plate and Convex Blocking Mound in Tunnel
5.3 Concrete Pouring and Curing
5.4 Quality Control
6 Track Slab Laying and Tight Alignment
6.1 Track Slab Rough Laying
6.2 Track Slab Tight Alignment
6.3 Resource Allocation
6.4 Quality Control
7 Cement Emulsified Asphalt Mortar Pouring
7.1 The Flow Chart for Cement Emulsified Asphalt Mortar Pouring
7.2 Construction Preparation before Mortar Pouring
7.3 Cement Emulsified Asphalt Mortar Preparation and Transport
7.4 Cement Emulsified Asphalt Mortar Pouring
7.5 Quality Control
8 Resin Construction for Convex Blocking Mound
8.1 Resin Preparation
8.2 Resin Pouring
8.3 Resource Allocation
8.4 Quality Control
References