4.8 Erection of Boiler Auxiliary Machinery
4.8.1 Inspection of main bearings of ball mill.
1 Scope:inspection of main bearings of ball mill.
2 Quality criterias and inspection methods are shown in Table 4.8.1.
Table 4.8.1 Inspection of main bearings of ball mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_423.jpg?sign=1739313195-UDgmtI4Xpg8ot3vlmI7oQg8SlFN7pwAb-0-643de8e717dd815afe4e3169d95f3d2b)
Table 4.8.1(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_424.jpg?sign=1739313195-fWol80QtAtnb9e1hhe4H2Iyt8ImFDx0y-0-414c20dda17a2297256200864e72fd73)
4.8.2 Inspection of large and small gears of ball mill.
1 Scope:inspection of large and small gears of ball mill.
2 Quality criterias and inspection methods are shown in Table 4.8.2.
Table 4.8.2 Inspection of large and small gears of ball mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_425.jpg?sign=1739313195-yYf6OY7CkssG9Htgn8EffaEYgQD1DOUp-0-9c193ada7a5184ea73faa73a2b947f4c)
Table 4.8.2 Inspection of large and small gears of ball mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_426.jpg?sign=1739313195-LL1jbYq8E0fqalamQR6yc3N3Ylq6UH6V-0-102d264486f2c83364a6f2b1f605afdd)
Table 4.8.2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_427.jpg?sign=1739313195-MFFTR54t4CpL33Bszj75KhbSxdwvrCqy-0-e3128381d3f46c03a881333fe79ccd51)
4.8.3 Erection of main bearings of ball mill.
1 Scope:erection of main bearings of ball mill.
2 Quality criteria and inspection methods are shown in Table 4.8.3.
Table 4.8.3 Erection of main bearings of ball mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_428.jpg?sign=1739313195-qrbs9kLDRCQQ9IG0K1tkQItyX0u06dP7-0-0e84a8369a5d0c30e1f4801764d2c443)
Table 4.8.3(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_429.jpg?sign=1739313195-UwdzZJSPPuFOJmqTFAMaZM3xEgZ3K2r5-0-478eae865934adb54e0abe4116ef11c7)
4.8.4 Erection of ball mill body.
1 Scope:erection of ball mill body.
2 Quality criteria and inspection methods are shown in Table 4.8.4.
Table 4.8.4 Erection of ball mill body
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_430.jpg?sign=1739313195-bjvMiMFOklQnHcyw4etk4YQd1zpqN9mC-0-38ea2237fef30ba2e86a1be3b4b6a3af)
Table 4.8.4(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_431.jpg?sign=1739313195-3HwC6yQY0wtxCy5SJr8muUIUvn85ZncR-0-72311ac8d2c002626e80b5a0b17dda33)
Table 4.8.4(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_432.jpg?sign=1739313195-7qAEIusZ9Dba1Mqhm7WgRMzCaLvzuH9v-0-357e0295e0e3785f7ddd13db4574f0c3)
4.8.5 Erection of transmission devices of ball mill.
1 Scope:erection of ball mill motor,reducer and barring devices.
2 Quality criteria and inspection methods are shown in Table 4.8.5.
Table 4.8.5 Erection of transmission devices of ball mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_433.jpg?sign=1739313195-5kYBaDh5feIMG9Uqvz7v18rb2Zadqkfw-0-f29e773aeb5c0af86415e332759344dd)
Table 4.8.5(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_434.jpg?sign=1739313195-NOTOnR2anxmfErM6N3aPWmPUz1A4A7e6-0-873b1eaafdd0cbc417797e20a46b5e05)
4.8.6 Erection of ball mill oil system.
1 Scope:erection of ball mill oil system.
2 Quality criteria and inspection methods are shown in Table 4.8.6.
Table 4.8.6 Erection of ball mill oil system
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_435.jpg?sign=1739313195-sVouBSdNtccYvlOAvxDs4SM8mZGCNPzZ-0-19bfc02f1451d9f9d3266153e7ea68d0)
Table 4.8.6(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_436.jpg?sign=1739313195-GBL0LnB7IiZBBthJybSclSkuhjYzZM7T-0-1c841a81a38895767e365f957ef1d5df)
4.8.7 Certification of hydrostatic tests of oil station cooler,bearing cooling water chamber.
1 Scope:tightness inspection of boiler auxiliary equipment in an oil system.
2 The certification contents are shown in Table 4.8.7.
Table 4.8.7 Certification of hydrostatic tests of oil station cooler,bearing cooling water chamber
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_437.jpg?sign=1739313195-iJd45JV1bo0UQG7HWKaoOtG13ZF3aKtB-0-bd137d6dced7a875372e44a3ac59773e)
4.8.8 Construction record.
1 Scope:erection construction records of whole boiler auxiliary equipments.The specific contents may be filled.
2 The record shall meet the requirements of Table 4.8.8.
Table 4.8.8 Construction record
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_438.jpg?sign=1739313195-I7sVoG14sVCz6NXIRKHA0PhdfIaQO1Ah-0-0b07547c194390cf59951fde54a1b780)
4.8.9 Mill bolts tightening record.
1 Scope:thermal tightening of mill bolts.
2 Record requirements are shown in Table 4.8.9.
Table 4.8.9 Mill bolts tightening record
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_439.jpg?sign=1739313195-kwcp5lQfddFtD8myOqUG1IEERyAlwOqy-0-517fdbeca7f9f0f527c4baa54999a229)
4.8.10 Certification of closing equipment manhole.
1 Scope:closing of manhole door after cleaning of boiler auxiliary equipments and before their trial operation.
2 Certification shall meet the requirements of Table 4.8.10.
Table 4.8.10 certification of closing equipment manhole
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_440.jpg?sign=1739313195-NFdJgLSnL6xDzzpfR86oh3KNI6UbBdTA-0-3b3e64c889242e603c0e4b80f701d834)
4.8.11 Inspection and certification before equipment trial operation.
1 Scope:inspection and certification for all rotary equipments of boiler auxiliary equipments before the trial operation.Inspection items can be added or deleted properly.
2 Certification shall meet the requirements of Table 4.8.11.
Table 4.8.11____________________Inspection and certification before equipment trial operation
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_441.jpg?sign=1739313195-4x45eYAq9IcLqXwIIP6VHBKuOJSzGUbH-0-f802cdd6db7d83aef53fe34b9a8791ab)
4.8.12 Certification of equipment trial operation.
1 Scope:certification of the trial operation of whole boiler auxiliary equipments.
2 Certification shall meet the requirements of Table 4.8.12.
Table 4.8.12 Certification of equipment trial operation
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_442.jpg?sign=1739313195-OlX6vjnZE4kebdhPSBkjKDsOdAvgQCh9-0-e0c2cb80b95aa7e8ebf03598bf05d2bc)
4.8.13 Erection of fan mill body.
1 Scope:erection of fan mill body.
2 Quality criteria and inspection methods are shown in Table 4.8.1.
Table 4.8.13 Erection of fan mill body
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_443.jpg?sign=1739313195-YTe2A3iAUfUXx4lAikysgS0BSkYIUL3X-0-7e5e764a1b92103a2c50d844b2e2f0ed)
Table 4.8.13(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_444.jpg?sign=1739313195-YrvoPkD3nwOPiNVKAcMAAiFyr0hF0H5B-0-4dc4bc2a3a60c1b22ae952054dbc4e39)
4.8.14 Erection of Fan Mill Oil System.
1 Scope:erection of fan mill oil system.
2 Quality criteria and inspection methods are shown in Table 4.8.14.
Table 4.8.14 Erection of fan mill oil system
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_445.jpg?sign=1739313195-rATPR2B79Aq2lcW7X18FuqVRXPIRz43R-0-10661688f9ab7bed77d31c31e3d50334)
Table 4.8.14(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_446.jpg?sign=1739313195-ZherpLDUFAyOn5jh9fASb7KOB0tTEeGX-0-7b5a6ff30fb60de8db1b384c9541d5a6)
4.8.15 Erection of fan mill transmission devices.
1 Scope:erection of fan mill transmission devices.
2 Quality criteria and inspection methods are shown in Table 4.8.15.
Table 4.8.15 Erection of fan mill transmission devices
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_447.jpg?sign=1739313195-P8f9D6ViR0oDkwWCUdXhK9h6exiifhET-0-7b794e7fc4a3f8d590e4bdd9276bacf8)
4.8.16 Erection of MPS(ZGM)medium speed mill body.
1 Scope:erection of MPS(ZGM)medium speed mill body.
2 Quality criterias and inspection methods are shown in Table 4.8.16.
Table 4.8.16 Erection of MPS(ZGM)medium speed mill body
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_448.jpg?sign=1739313195-GLSW2K5jBnaM7sqZeC4hTka1NyeRia99-0-94812ee43c43278fb437770126b89081)
Table 4.8.16(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_449.jpg?sign=1739313195-YPwTJyPuQL8TXZlepPb43qcfgXfK70Ai-0-5e011ab318e49a593e49c9dc38abf53e)
4.8.17 Erection of MPS(ZGM)medium speed mill transmission devices.
1 Scope:erection of medium speed mill transmission devices.
2 Quality criteria and inspection methods are shown in Table 4.8.17.
Table 4.8.17 Erection of MPS(ZGM)medium speed mill transmission devices
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_450.jpg?sign=1739313195-npJ4xxCub4HryAeu6lCplnER8N54FoUZ-0-2595c302cb4e2dd61baeae6c528a92a4)
4.8.18 Erection of Medium Speed Mill Oil System.
1 Scope:erection of medium speed mill oil system.
2 Quality criteria and inspection methods are shown in Table 4.8.18.
Table 4.8.18 Erection of medium speed mill oil system
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_451.jpg?sign=1739313195-GqIRr1yGpiKhTLjzp4JgAT8CKtyhmhX9-0-6879211e3290edcbb16036d62a62685b)
4.8.19 Erection of E-type medium speed coal mill body.
1 Scope:erection of E-type medium speed coal mill body.
2 Quality criteria and inspection methods are shown in Table 4.8.19.
Table 4.8.19 Erection of E-type medium speed coal mill body
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_452.jpg?sign=1739313195-iThNSECzJLm8vmnjd0FxCtLm7wgikR6l-0-09a67fa1dba464e94f608e8bab82b797)
Table 4.8.19(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_453.jpg?sign=1739313195-cpP4rRFZFyxZ0LCGSLPqFRLlJRxTzylG-0-aac6e4f5767536d0d8ba24153fdab5bb)
4.8.20 Erection of E-type medium speed coal mill driving device.
1 Scope:erection of E-type medium speed coal mill driving device.
2 Quality criteria and inspection methods are shown in Table 4.8.20.
Table 4.8.20 Erection of E-type medium speed coal mill driving device
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_454.jpg?sign=1739313195-N8HYeuVZASV89F21DfOC4PqWBEtD54HM-0-f51f226e1cd891e5156187519dc61095)
4.8.21 Erection of RP(HP)bowl type coal mill body.
1 Scope:erection of RP(HP)bowl type coal mill body.
2 Quality criterias and inspection methods are shown in Table 4.8.21.
Table 4.8.21 Erection of RP(HP)bowl type coal mill body
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_455.jpg?sign=1739313195-H8rbeGfF26ZKjhB5i9qO7e05eWzphPBZ-0-4539bc57ecc2b6b64eb3eadf994ac71d)
Table 4.8.21(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_456.jpg?sign=1739313195-tIvWgobWiEHMyj1nmoUBkHwxODmIaPVu-0-9c6842c858bbcf3dd0e5e13315f2d75e)
4.8.22 Erection of RP(HP)bowl type coal mill transmission devices.
1 Scope:erection of RP(HP)bowl type coal mill transmission devices.
2 Quality criteria and inspection methods are shown in Table 4.8.22.
Table 4.8.22 Erection of RP(HP)bowl type coal mill transmission devices
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_457.jpg?sign=1739313195-zjPaCcE90hrnwx9sSyqLwXOFUf93KO6S-0-04b4cd50528ac0135a72823376d74c0c)
4.8.23 Erection of centrifugal fan.
1 Scope:erection of all centrifugal fans in boiler auxiliary machineries.
2 Quality criteria and inspection methods are shown in Table 4.8.23.
Table 4.8.23 Erection of centrifugal fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_458.jpg?sign=1739313195-EPtVJwNlXZoYp2iaDkZhUWw1Z2vWU3gh-0-da1e556dcc5e3d15a36136f41d54fd7c)
Table 4.8.23(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_459.jpg?sign=1739313195-o9weM1uvcdBKs6ItRL4OLXuv90vi37YP-0-48e0914ddcbfd13ecb47a467b83162c9)
Table 4.8.23(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_460.jpg?sign=1739313195-1a7hIatra0VFhHsvXfsMczO2h1gDUTuJ-0-a46961d34e23e2900a508fff05f4b0a0)
4.8.24 Erection of axial flow fan.
1 Scope:erection of axial flow fans in boiler auxiliary machineries.
2 Quality criteria and inspection methods are shown in Table 4.8.24.
Table 4.8.24 Erection of axial flow fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_461.jpg?sign=1739313195-yWMHEJh4tCwVAH2zpXl9vBjcJ4QHfRpB-0-0b8593569bda63d070ff1e385a446107)
Table 4.8.24(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_462.jpg?sign=1739313195-PwbP5cvHVJvvKypY8IRrv0lEEGs4nJhZ-0-2dfe3c0209dcd70e2f3de72dd6d437ad)
4.8.25 Erection of fan motor.
1 Scope:erection of fan motors in boiler auxiliary machineries.
2 Quality criteria and inspection methods are shown in Table 4.8.25.
Table 4.8.25 Erection of fan motor
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_463.jpg?sign=1739313195-E7ONLw0ob6ZQMHEJUr6e3fL4XMXkIj80-0-8aafcfc533d5689a6c472aa7211b0497)
4.8.26 Erection of fan oil system.
1 Scope:erection of fans with oil system in boiler auxiliary machineries.
2 Quality criteria and inspection methods are shown in Table 4.8.26.
Table 4.8.26 Erection of fan oil system
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_464.jpg?sign=1739313195-gCcE80enip30kOJQNNMMc9DjKIO6M7Jn-0-a3dc86879a7e9e38acc8314a67c9fad1)
4.8.27 Erection of high pressure fluidization fan.
1 Scope:erection of medium and high pressure fluidization fan in boiler auxiliary machineries.
2 Quality criteria and inspection methods are shown in Table 4.8.27.
Table 4.8.27 Erection of high pressure fluidization fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_465.jpg?sign=1739313195-gAW8Ibl83j2HS79OiPdPKZVILXhvgq6e-0-f2e3bcfd7f04297f5d623862c0db7098)
Table 4.8.27(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_466.jpg?sign=1739313195-gJAdZtRH8yRFTHw8lv2NkYRCGvUMISYg-0-afcf13dc653bc81b19e772b02a842374)
4.8.28 Erection of pulverized coal impeller feeder.
1 Scope:erection of pulverized coal impeller feeder.
2 Quality criteria and inspection methods are shown in Table 4.8.28.
Table 4.8.28 Erection of pulverized coal impeller feeder
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_467.jpg?sign=1739313195-DiyiW7HOsPw1n7ViDLB2Q6cv5XMiychb-0-bb4feccb92b05f37c40c17cb8a4507e9)
4.8.29 Erection of pulverized coal screw conveyer.
1 Scope:erection of such type of pulverized coal screw conveyers.
2 Quality criteria and inspection methods are shown in Table 4.8.29.
Table 4.8.29 Erection of pulverized coal screw conveyer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_468.jpg?sign=1739313195-jCXUa2Z5ToEcu2WOVOi53dzS0f00AFh7-0-cfd3458663b4908aad0bf71924ca04f7)
Table 4.8.29(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_469.jpg?sign=1739313195-cGIkB8SmxAlmnK6kaY5U8KhQL5HJ0NyE-0-f0e49e797b47615fb268ac1ff91d2202)
4.8.30 Erection of pulverized coal scraper conveyer.
1 Scope:erection of such type of coal feeders.
2 Quality criteria and inspection methods are shown in Table 4.8.30.
Table 4.8.30 Erection of pulverized coal scraper conveyer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_470.jpg?sign=1739313195-4EeRGPEk73MBFfCT3Aa0b2mbWMancklb-0-4edf7426e72a415154675ce4f0ced01b)
Table 4.8.30 (continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_471.jpg?sign=1739313195-FxmMDPvKe0H6Tt2bvYKBft4LAn11atty-0-49c7a7506dd4abe2322f1a4ecb670a78)
4.8.31 Erection of coal vibrating feeder.
1 Scope:erection of such type of coal feeders.
2 Quality criteria and inspection methods are shown in Table 4.8.31.
Table 4.8.31 Erection of coal vibrating Feeder
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_472.jpg?sign=1739313195-Qmj6t7JlEQcuK7qXZr1Xqt7vKlQXKRUk-0-7094e95c3c36368db864dec2bdec9d4c)
4.8.32 Erection of coal belt feeder.
1 Scope:erection of coal belt feeder.
2 Quality criteria and inspection methods are shown in Table 4.8.32.
Table 4.8.32 Erection of coal belt feeder
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_473.jpg?sign=1739313195-7GnhB1UR342RAYFltYLmOMYJuW3x7Dpp-0-c58076daf2d2e6343a9f53780c1c3c7a)
4.8.33 Erection of air compressor.
1 Scope:erection of air compressor.
2 Quality criteria and inspection methods are shown in Table 4.8.33.
Table 4.8.33 Erection of air compressor
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_474.jpg?sign=1739313195-NceHfTVJplwmVl4PUwtYapz9FY74mjDq-0-a3cdb4b85050ede19a366f05183de882)
Table 4.8.33(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_475.jpg?sign=1739313195-mNaRfJR7gBXfouggvIOTLowa4lK7hc3j-0-41e8616b4cf289c702d5be210688f13c)
Table 4.8.33(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_476.jpg?sign=1739313195-xoLDjBquStsDgR0XVQKzW8dnfnzj4nb6-0-e294c2824240cd290d5b49775bcbd14c)
4.8.34 Erection of dryer.
1 Scope:erection of dryers in air compressor room.
2 Quality criteria and inspection methods are shown in Table 4.8.34.
Table 4.8.34 Erection of dryer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_477.jpg?sign=1739313195-E3MDLXf4cVihaJx10sVWN8p0mU35L3ki-0-ca0aaaaef0e4853046b8b92e2404786e)
4.8.35 Erection of cooling water pump.
1 Scope:erection of such pumps.
2 Quality criteria and inspection methods are shown in Table 4.8.35.
Table 4.8.35 Erection of cooling water pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_478.jpg?sign=1739313195-Nm7TsMudEQDf2k7HiHHP6BGCbqN2XPBU-0-bae04b431c91bce7ef87b896330d2b68)
Table 4.8.35(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_479.jpg?sign=1739313195-Pl89e0J7PQY6fiChgQ5v9Mig5Qx79sdU-0-554012f40b4196ae0bbd85ed3f29b8c0)
4.8.36 Erection of draining pump.
1 Scope:erection of such type of pumps.
2 Quality criteria and inspection methods are shown in Table 4.8.36.
Table 4.8.36 Erection of draining pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_480.jpg?sign=1739313195-sj3j3Etxwp8LPsm9p1079X2Dn7tGylwN-0-e83b6e0f755a4d3cfe7b9ddbe90e16e9)
Table 4.8.36(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_481.jpg?sign=1739313195-quxKqeAdU8HGXridSqDDHpnyLSPOxBIS-0-7b32ed7c64753f90f8a3205b31c236e6)
4.8.37 Erection of boiler forced circulating Pump.
1 Scope:erection of boiler forced circulating pump.
2 Quality criteria and inspection methods are shown in Table 4.8.37.
Table 4.8.37 Erection of boiler forced circulating pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_482.jpg?sign=1739313195-1fLxVkj81up9qXkmibeHHUJIqAaX6U4o-0-00e388f97f5c6b3978ea9631af71e85b)
4.8.38 Erection of start-up circulation pump.
1 Scope:erection of start-up boiler circulation pump.
2 Quality criteria and inspection methods are shown in Table 4.8.38.
Table 4.8.38 Erection of Start-up circulation pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_483.jpg?sign=1739313195-X2cvuCa9TmpbkvtJ9LB4kUVyy2weYWkF-0-4442228941a6899d4af2997b710e0f0c)
4.8.39 Erection of Emergency Water Feed Pump.
1 Scope:erection of boiler emergency water feed pump.
2 Quality criteria and inspection methods are shown in Table 4.8.39.
Table 4.8.39 Erection of emergency water feed pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_484.jpg?sign=1739313195-GoK8H50c6uDutfXOqnTDbteLX6Tp6T9z-0-380dda4da5792233453579e985c425a9)
Table 4.8.39(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_485.jpg?sign=1739313195-AYYnLGPkerfmZw6xaOAK6qNkUUE1OQ18-0-ae7888a38a0f4fc278e2320a9956e5ea)
4.8.40 Trial operation of pump subsection.
1 Scope:erection of all the pumps at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.40.
Table 4.8.40 Trial operation of pump subsection
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_486.jpg?sign=1739313195-eNbuQC51gGLdKRQEOkA7DeaqtQm7REZK-0-c4d91b953a6c7988b710e416bf0cba4d)
Table 4.8.40(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_487.jpg?sign=1739313195-WmaAndEI9sHEJo73OjALxUgJsCxLnUGn-0-ebd41769a9343d4ae0b63c1f97ecc103)
4.8.41 Erection of slag extractor.
1 Scope:Table 4.8.41-1 is suitable for the erection of boiler slag extractor;and Table 4.8.41-2 is suitable for the erection of boiler dry slag discharge equipment.
2 Quality criteria and inspection methods are shown in Table 4.8.41-1 and 4.8.41-2.
Table 4.8.41-1 Erection of slag extractor
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_488.jpg?sign=1739313195-tnYCVkxc6H7L5D03p1THBcziVUI8gcZV-0-503da34993b836649f7a2c96c1a637d1)
Table 4.8.41-2 Erection of dry slag slag discharge equipment
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_489.jpg?sign=1739313195-6M7JcQr4DGxlIRcLXCeM7CLrOrySvptB-0-14dd48f46045ff9bb5f436c54b2b863b)
Table 4.8.41-2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_490.jpg?sign=1739313195-QOciK2XpXPvZUgDe8nwNqDT6LNBbgdhT-0-f77bb4155381dda5e01ab8208be33211)
Table 4.8.41-2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_491.jpg?sign=1739313195-enK4onGkNL0RHOtoMYKLLrr3MyqHv7iK-0-38af6bc5694b0928a2e048ab9268d19b)
4.8.42 Erection of slag crusher.
1 Scope:erection of boiler slag crusher.
2 Quality criteria and inspection methods are shown in Table 4.8.42.
Table 4.8.42 Erection of slag crusher
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_492.jpg?sign=1739313195-9gbuuTYlHZbAfCcdko1khtYuvlCnqrOw-0-16c6afdfb11ebf46f27d87242492b7bf)
4.8.43 Erection of slag conveyer.
1 Scope:erection of boiler slag conveyer.
2 Quality criterias and inspection methods are shown in Table 4.8.43.
Table 4.8.43 Erection of slag conveyer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_493.jpg?sign=1739313195-LPNKtscz4LfPkcosKqYhXpXok5dSf9Ys-0-31edad2fcc22d61c69b6026cab7c1c34)
Table 4.8.43(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_494.jpg?sign=1739313195-A6tc9XugqysUSlxya1gASRQIUiw5nGBH-0-8bf6f1ff5ab8a4a6136d4a2527eab05e)
4.8.44 Erection of slurry pump.
1 Scope:erection of boiler slurry pump.
2 Quality criteria and inspection methods are shown in Table 4.8.44.
Table 4.8.44 Erection of slurry pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_495.jpg?sign=1739313195-Xwu1CySix6L5eoLHaMPFzUzIzj3YRTtq-0-a8e4575a08a68609a9b9507135c6c42e)
Table 4.8.44(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_496.jpg?sign=1739313195-LWWxaS66xKWXKuU1nMDUa4R0BZAeeDRd-0-ae0ffbc84233a97ba106c6f52eb26b83)
4.8.45 Erection of overflow pump.
1 Scope:erection of such type of water pumps.
2 Quality criteria and inspection methods are shown in Table 4.8.45.
Table 4.8.45 Erection of overflow pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_497.jpg?sign=1739313195-tTsH6HpnjRk3gDvHMpSPfHfTWBOv9Jsg-0-9c78ec51c52d3620efe583e3cc32e287)
4.8.46 Erection of flushing pump.
1 Scope:erection of such type of pumps for boiler.
2 Quality criteria and inspection methods are shown in Table 4.8.46.
Table 4.8.46 Erection of flushing pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_498.jpg?sign=1739313195-4bFadb9g3Dmle98SHEHe73pNAbvyTolc-0-a26a70e9d4cda2e5f60eada861f97499)
4.8.47 Erection of dredging machine.
1 Scope:erection of dredging machine.
2 Quality criteria and inspection methods are shown in Table 4.8.47.
Table 4.8.47 Erection of dredging machine
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_499.jpg?sign=1739313195-fBszfXKx3yRodzcvWRDH443bCrOlKdhO-0-fa86e48a86d0ffc7f7ae63b53f62a1a6)
4.8.48 Erection of gasification fan.
1 Scope:erection of boiler gasification fan.
2 Quality criteria and inspection methods are shown in Table 4.8.48.
Table 4.8.48 Erection of gasification fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_500.jpg?sign=1739313195-v3Z5mjXBNFjxcNewDDVBC0nW1THKNuUa-0-c1d9a657da3cfbdffccbad553a59d239)
4.8.49 Erection of double-axles mixer.
1 Scope:erection of double-axles mixer.
2 Quality criteria and inspection methods are shown in Table 4.8.49.
Table 4.8.49 Erection of double-axles mixer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_501.jpg?sign=1739313195-K7SWvFNpRmKa0Ux1I1wbEqBX5TWzh5u8-0-9aa2bebb8b094a4387809e3e117a6700)
Table 4.8.49(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_502.jpg?sign=1739313195-69PMgtsg3sU1c8XBh2gHi2GyYS8LP3OE-0-fc16b0df4806128e0635632ce7a515cb)
4.8.50 Erection of concentrator.
1 Scope:erection of concentrator.
2 Quality criteria and inspection methods are shown in Table 4.8.50.
Table 4.8.50 Erection of concentrator
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_503.jpg?sign=1739313195-yZdIhfanpCWy1ysz5DII8pbqPHfAxuKo-0-91f3bb3ef945e49a4f088671fd134c95)
Table 4.8.50(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_504.jpg?sign=1739313195-hP5bv2Nj91oymS1BU6jS1WoZLqCBu7os-0-febba92d6339d82d64ff2eab2fdb4d7e)
4.8.51 Erection of centrifugal slurry pump.
1 Scope:erection of centrifugal slurry pump.
2 Quality criteria and inspection methods are shown in Table 4.8.51.
Table 4.8.51 Erection of centrifugal slurry pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_505.jpg?sign=1739313195-5RDV6nuuYgZontR0ZqceQBsyErZipbRw-0-6e5c0659ace2d1d7d368d34d29706cbd)
Table 4.8.51(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_506.jpg?sign=1739313195-S6j8rTm8M4Z9mm1CLF5c7Sj6pVPv1TRE-0-1c21466c671791fd2253b75291af49ef)
4.8.52 Erection of water spray plunger slurry pump.
1 Scope:erection of water spray plunger slurry pump.
2 Quality criteria and inspection methods are shown in Table 4.8.52.
Table 4.8.52 Erection of water spray plunger slurry pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_507.jpg?sign=1739313195-uWMKHpAnmArpbWWtAYI87fHe5E0IDlZh-0-881f92d2bd4b09017982b94fd7b04048)
Table 4.8.52(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_508.jpg?sign=1739313195-tUNGtDyr4TQOCPYJbI1TeSQgFCQno69V-0-aa64dc2060de940c3f58d63d0c200690)
4.8.53 Erection of water-lsolated slurry pump.
1 Scope:erection of centrifugal slurry pump.
2 Quality criteria and inspection methods are shown in Table 4.8.53.
Table 4.8.53 Erection of water-isolated slurry pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_509.jpg?sign=1739313195-DKjTQwM7caVBLXdXR2mmDvYTeG5JbpcB-0-93e17b9d4f24f15bf036fd791eb7652a)
4.8.54 Erection of slurry high pressure flushing pump.
1 Scope:erection of slurry high pressure flushing pump.
2 Quality criteria and inspection methods are shown in Table 4.8.54.
Table 4.8.54 Erection of slurry high pressure flushing pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_510.jpg?sign=1739313195-to0zCISoB8ZlLtWVQbAWagutvOhvvb8c-0-7f779520f7b13c63ed0dbdb76cb847f7)
Table 4.8.54(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_511.jpg?sign=1739313195-ZP06SQwKYc1YqfiUzNeEeXhq0vvW31fX-0-0ff7a2cbfd4424a6f453ea67315b05df)
4.8.55 Erection of oil-isolated mud pump.
1 Scope:erection of oil-isolated mud pump.
2 Quality criteria and inspection methods are shown in Table 4.8.55.
Table 4.8.55 Erection of oil-isolated mud pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_512.jpg?sign=1739313195-WLqBLVKWQ9i5yMt8vAZlfHWeNZ83TFBH-0-6f78ab8bd906f1defa6ab9bb949cbe37)
Table 4.8.55(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_513.jpg?sign=1739313195-KsGkGjoxfz6feyRNAs9sDv5cbt3Fr6Ij-0-ce170cd49d6ae949f60106884a133a18)
4.8.56 Erection of ash removal pipe-belt conveyer.
1 Scope:erection of ash removal pipe-belt conveyer.
2 Quality criteria and inspection methods are shown in Table 4.8.56.
Table 4.8.56 Erection of ash removal pipe-Belt conveyer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_514.jpg?sign=1739313195-tjCO6Bq2UcviIyEYarPH21cgGQ7AYAeH-0-288ae3285eb39c0abd924796649b8a0b)
Table 4.8.56(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_515.jpg?sign=1739313195-90HUvfMpqESHCR6GasCGbKNJbFSTiPp6-0-76b4ef51446b2539fd7061d44e93e944)
Table 4.8.56(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_516.jpg?sign=1739313195-lkYBTi81j8l6f3cHmtIu4JoBBp4qhrFX-0-e3a0fdc4498f63027c9c48bdc3e3f23d)
4.8.57 Erection of roots fan.
1 Scope:erection of roots fan.
2 Quality criteria and inspection methods are shown in Table 4.8.57.
Table 4.8.57 Erection of roots fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_517.jpg?sign=1739313195-hG0YlbwQz5q8E5bFoxMzXjQBV5b50ChK-0-96fce1ac7e165f422cbf63a873739fc5)
Table 4.8.57(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_518.jpg?sign=1739313195-tzX2R4zmkh1AXZxyzOtosydcbL6xn28K-0-b57a916582156aa4f77e367d517b1aab)
4.8.58 Maintenance and erection of electric hoist.
1 Scope:erection of all electric hoists at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.58.
Table 4.8.58 Maintenance and erection of electric hoist
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_519.jpg?sign=1739313195-4j1e0C497RQHW3u3Vhe2DwSlui5uxpRt-0-ca96f676aac0f806e6a83e29a84daad5)
Table 4.8.58(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_520.jpg?sign=1739313195-64FPvBbyEk4ld7JENRxSixeucEWlXVUf-0-a4211abab99de38754b1aa18e791bebb)
4.8.59 Electric hoist load test.
1 Scope:load test of all electric hoists at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.59.
Table 4.8.59 Electric Hoist Load Test
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_521.jpg?sign=1739313195-CP5cFb2VdEZ8MDtLhfebbLDX6zsHikWX-0-732bcb97af313a1c7871a6896d329363)
4.8.60 Erection of rails.
1 Scope:erection of lifting machinery rails at boiler side.
2 Quality criterias and inspection methods are shown in Table 4.8.60.
Table 4.8.60 Erection of rails
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_522.jpg?sign=1739313195-a3cqjRpRYZqTSOSKaAbdU08M64Bwfxu7-0-1244b1c0aed5c16ebe26f3db9cbe04a6)
Table 4.8.60(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_523.jpg?sign=1739313195-iU3zq8Tiq7uhayyU6e3L8SANrpy0ovZJ-0-5ebfa8fd206fd6c072075d1d7a57943d)
4.8.61 Assembly and erection of crane bridge.
1 Scope:assembly and erection of bridge crane bridge at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.61.
Table 4.8.61 Assembly and erection of crane bridge
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_524.jpg?sign=1739313195-NwgA2ZQB7tpEBU8WDe4H6W3sRL5dk51H-0-1bf9b584be4cdfea3ecdac6332df3b34)
Table 4.8.61(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_525.jpg?sign=1739313195-XmJY7Kz0oziMyVXWpLiCv8NlbbJFBx4m-0-608250c4ce72492084711f2de92fbdfa)
4.8.62 Maintenance and erection of transmission machinery.
1 Scope:maintenance and erection of lifting machinery transmission devices at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.62.
Table 4.8.62 Maintenance and erection of transmission machinery
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_526.jpg?sign=1739313195-dSFrUW8wKz8BkpFH0rpQpxxKiJMpMMWa-0-93b3cf11eae73d240c9553d45dc02b92)
4.8.63 Crane no-load/static load test.
1 Scope:no-load/static load test of crane machinery at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.63.
Table 4.8.63 Crane no-load/static load test
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_527.jpg?sign=1739313195-LDKJaGzDgQNp9EXhIchwJjNWnhkQ4Iqx-0-30fea8652254b70e464c054683447439)
4.8.64 Crane dynamic load test
1 Scope:dynamic load test of crane at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.64.
Table 4.8.64 Crane dynamic load test
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_528.jpg?sign=1739313195-sOIC6L0OVLQkZIqgE1KmRCaFCofxjGu3-0-04b709c98727d145d00eabfc999204f0)
4.8.65 Crane live trial operation.
1 Scope:trial operation of live crane machinery at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.65.
Table 4.8.65 Crane live trial operation
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_529.jpg?sign=1739313195-cjVcM3sWC2oiBpR5VkptwBMNkrx0NG27-0-a04d0bbfc26014c1edc3e48e971adaf4)
Table 4.8.65(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_530.jpg?sign=1739313195-ruHoW6Tzm4tSGGFk3gOgwICR4Fojme6T-0-14ed45eea78300bb5997780ae431303b)
4.8.66 Mandatory provisions implementation inspection sheet of erection subsection project of coal mill.
1 Scope:mandatory provisions implementation inspection of erection subsection project of coal mill of the boiler auxiliary machineries.
2 Mandatory provisions implementation shall meet the requirements of Table 4.8.66.
Table 4.8.66 Implementation inspection sheet of mandatory provisions of erection subsection project of coal mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_531.jpg?sign=1739313195-RrxEfrV8tsTTNkQbwXQ3tCFCy0wqiCxU-0-e8e689d2fcc75a2dc26dd6a974838e1c)
Table 4.8.66(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_532.jpg?sign=1739313195-gOT3KafQwo4orvvQ25xOjjMipj2r4eTP-0-63d19643971107851b8270938808e716)
4.8.67 Implementation inspection sheet of mandatory provisions of erection subsection project of fan.
1 Scope:mandatory provisions implementation situations inspection of fan erection in the boiler auxiliary machineries.
2 Mandatory provisions implementation situations shall meet the requirements of Table 4.8.67.
Table 4.8.67 Implementation inspection sheet of mandatory provisions of erection subsection project of fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_533.jpg?sign=1739313195-hOzSjaqQErt1aaMyLvWrNENhl20EMbwu-0-03c2e63026245f0422406fa85b754693)
4.8.68 Implementation inspection sheet of mandatory provisions of erection subsection project of doal feeder.
1 Scope:mandatory provisions implementation situations inspection of erection subsection project of boiler coal feeder.
2 Mandatory provisions implementation situations shall meet the requirements of Table 4.8.68.
Table 4.8.68 Implementation inspection sheet of mandatory provisions of erection subsection project of coal feeder
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_534.jpg?sign=1739313195-J83inNzMaqMxHQBhWPYUKpfdZfQxqdVX-0-04919b30dc383ef6fbf94835ec56f673)
4.8.69 Implementation inspection sheet of mandatory provisions of erection subsection project of air compressor.
1 Scope:mandatory provisions implementation situations inspection of erection subsection project of air compressor.
2 Mandatory provisions implementation situations shall meet the requirements of Table 4.8.69.
Table 4.8.69 Implementation inspection sheet of mandatory provisions of erection subsection project of air compressor
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_535.jpg?sign=1739313195-lv3TAaOhjr02eeMCLdvMzK572H8j5Qsd-0-8dbd3908ab4c81e908670578da435e09)
4.8.70 Mandatory provisions implementation inspection sheet of erection subsection project of pump equipments.
1 Scope:mandatory provisions implementation inspection of erection subsection project of pump equipment in boiler auxiliary machineries.
2 Mandatory provisions implementation shall meet the requirements of Table 4.8.70.
Table 4.8.70 Mandatory provisions implementation inspection sheet of erection subsection project of pump equipments
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_536.jpg?sign=1739313195-LAem5apKVPT5GZdEfiAClW4Iw8feHlrk-0-8c77b7a90868c6a8f8366d33aecf0a39)
Table 4.8.70(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_537.jpg?sign=1739313195-PfOUVomoIqzkMtDjurbeNXa2lY0XBRWA-0-46de071460875e3b327c0327a66416a3)
4.8.71 Implementation inspection sheet of mandatory provisions of erection subsection project of ash/slag removal equipment.
1 Scope:mandatory provisions implementation situations inspection of erection subsection project of ash/slag removal equipment in boiler auxiliary machineries.
2 Mandatory provisions implementation situations shall meet the requirements of Table 4.8.71.
Table 4.8.71 Implementation inspection sheet of mandatory provisions of erection subsection project of ash/slag removal equipment
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_538.jpg?sign=1739313195-XRdlDLGZOgp9NI5e3X8xrL2DlBUqQAaZ-0-15a0dde9ba8a56374c4bcaeb100eacff)
Table 4.8.71(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_539.jpg?sign=1739313195-5HQQIQjw2gWOaUwbyLsx1v7nnK033FdN-0-0a17d63cf21848a47059bb1596982917)
4.8.72 Implementation inspection sheet of mandatory provisions of erection subsection project of lifting facilities in boiler room.
1 Scope:mandatory provisions implementation situations inspection of erection subsection project of lifting facilities in boiler room.
2 Mandatory provisions implementation situations shall meet the requirements of Table 4.8.72.
Table 4.8.72 Implementation inspection sheet of mandatory provisions of erection subsection project of lifting facilities in boiler room
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_540.jpg?sign=1739313195-fWsoN72OpNLIjgjWZpXvFDadOwPfBwcB-0-831c1932c85ee8d677b0b44e9f4360c1)
Table 4.8.72(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_541.jpg?sign=1739313195-ODEDw0zMvt0EbI84S50GTjA0MEN8FYhq-0-84e91a9024eae84e1cf8d1660a62ed6f)