4.11 Erection of Denitrification Fication Equipment
4.11.1 Certification of pressure decay test of denitrification flue gas system and reactors.
1 Scope:certification of pressure decay test of denitrification flue gas system and reactors.
2 Certification of pressure decay test of denitrification flue gas system and reactors shall meet the requirements of Table 4.6.2.
4.11.2 Erection of catalyst layer trusses.
1 Scope:erection of catalyst layer trusses of denitrification device.
2 Quality criteria and inspection methods are shown in Table 4.11.2.
Table 4.11.2 Erection of catalyst layer trusses
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_608.jpg?sign=1738885780-TScbJXnpmHsW9DwHrWzyKMaoLycOAb8h-0-0862614fca8696007743f0a3dacc8f87)
Table 4.11.2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_609.jpg?sign=1738885780-CHxVrPxvPJgGgQlv3wu4NpwzzZiBwhuD-0-46c28cbc2c1b05835e3ecc8bb2af18e7)
4.11.3 Erection of catalyst and seals.
1 Scope:inspection and erection of catalyst modules and catalyst seals in denitrification devices.
2 Quality criteria and inspection methods are shown in Table 4.11.3.
Table 4.11.3 Erection of catalyst and seals
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_610.jpg?sign=1738885780-XktL3uxZq1nUYF1WKoPxIhCdWUr2HnCL-0-9d9afc6b03a67da10c5b9d924374fac1)
Table 4.11.3(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_611.jpg?sign=1738885780-rSJm481a5InXTLQFzhrJxeO7se153VAH-0-2b7f9a0fd44daa067442c1d35b03dd10)
4.11.4 Erection record of catalyst modules.
1 Scope:erection of catalyst modules.Table 4.11.4 shall be used in sampling inspection after erection.
2 The record shall meet the requirements of Table 4.11.4.
Table 4.11.4 Erection record of catalyst modules
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_612.jpg?sign=1738885780-R9jQqzySOJQu1Cxipumcn8NlUlMDmRrr-0-a2c646717417e124260c441d066f71dc)
4.11.5 Certification of catalyst erection and concealing.
1 Scope:erection of catalyst modules.
2 The certification shall meet the requirements of Table 4.11.5.
Table 4.11.5 Certification of catalyst erection and concealing
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_613.jpg?sign=1738885780-Yv3ni1va9sshEWbSOUsKYxl9OOtuMfBc-0-22a1d97e555c88334cbb43251d3d6cbb)
4.11.6 Inspection and erection of reductant storage tank.
1 Scope:inspection and erection of reductant storage tank.
2 Quality criteria and inspection methods are shown in Table 4.11.6.
Table4.11.6 Inspection and erection of reductant storage tank
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_614.jpg?sign=1738885780-BYW4AFB5UX6UPso3IQStOsypUaGgRsah-0-761511db83053390fe89c82aee722f27)
Table 4.11.6(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_615.jpg?sign=1738885780-aAgcK8T7hfL35RJkzdXqyskpe6cWdKRn-0-f4965010f2179f4e238b292e9ed4feb2)
Table 4.11.6(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_616.jpg?sign=1738885780-dInrhZQ6XL20mLX91wjdkXLqVwqUcUL7-0-56b4c8a6dce823e69e793f4088068244)
Note:a—L represents the length of the reductant storage tank.
4.11.7 Inspection and erection of internal devices of reductant storage tank.
1 Scope:erection of the reductant storage tank internal devices.
2 Quality criteria and inspection methods are shown in Table 4.11.7.
Table 4.11.7 Inspection and erection of internal devices of reductant storage tank
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_617.jpg?sign=1738885780-gXPqXrd3QHDg7j314zpoXpI74rm0JGHB-0-e704054b5e957f3123de806237a4304d)
Table 4.11.7(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_618.jpg?sign=1738885780-6gYEOCZqDywqhq2CF9h8PPZrhlOWnz5V-0-aba3f85824619f51b71be818ea3b0346)
4.11.8 Inspection and erection of reductant heater body.
1 Scope:inspection and erection reductant heater body.
2 Quality criteria and inspection methods are shown in Table 4.11.8.
Table 4.11.8 Inspection and erection of reductant heater body
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_619.jpg?sign=1738885780-nTEcbCfqkfNmokJrZLjONgjlyTbzVxu6-0-0320c1454c3d7cfc521a37c803130c33)
Table 4.11.8(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_620.jpg?sign=1738885780-bC27NszpSL2KaspbFq2muCqaRG3KBLJO-0-1cd019645f06dc9aac6d02040a2b8a11)
Note:L—represents the length of the reductant heater body.
4.11.9 Reductant preparation and butt joint of transportation pipes.
1 Scope:reductant preparation and butt joints of transportation pipes in denitrification devices.
2 Quality criteria and inspection methods are shown in Table 4.11.9.
Table 4.11.9 Reductant preparation and butt joint of transportation pipes
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_621.jpg?sign=1738885780-F61QoHIhCS7Y2ZkWqpzG3uaXAwB8Yk3a-0-a15cffa527f582f04e613d7a14323250)
4.11.10 Certification of hydrostatic test of reductant storage tank.
1 Scope:certification of hydrostatic test of reductant storage tank.
2 Certification of hydrostatic test of reductant storage tank shall meet the requirements of Table 4.11.10.
Table 4.11.10 Certification of hydrostatic test of reductant storage tank
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_622.jpg?sign=1738885780-ZoVGoXDdkSSNDKCNzVk8EOG2MvOPHdzV-0-0915e179d7629db03d0a879e28b8d034)
4.11.11 Certification of reductant pipe hydrostatic test.
1 Scope:Certification of hydrostatic test of reductant pipes.
2 Certification of hydrostatic test of reductant pipes shall meet the requirements of Table 4.11.11.
Table 4.11.11 Certification of reductant pipe hydrostatic test
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_623.jpg?sign=1738885780-lsAE1D6CIUvcAUGCT1xFKFoZ3V2JBKNa-0-f90ea7fa9a6b8a2008bb2c4c43d24cc0)
4.11.12 Certification of reductant storage and transportation pipe leak test.
1 Scope:certification of leak test of reductant storage and transportation pipes.
2 Certification of leak test of reductant storage and transportation pipes shall meet the requirements of Table 4.11.12.
Table 4.11.12 Certification of reductant storage and transportation pipe leak test
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_624.jpg?sign=1738885780-xHRFP8Zg6EVVfEgMAMqsuOyTzQp4kSwC-0-93f152f01234e2c2819fc57d2e341d1b)
4.11.13 Certification of reductant preparation and blowing transportation pipes.
1 Scope:certification of reductant preparation and blowing transportation pipes.
2 Certification of the blowing of reductant preparation and transportation pipes shall meet the requirements of Table 4.11.13.
Table 4.11.13 Certification of reductant preparation and blowing transportation pipes
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_625.jpg?sign=1738885780-Dugl8vuisnfoyfBkPIpyvqAKyLPGPNsN-0-2873a1c5ac2316c915acc7f822bac02c)
4.11.14 Certification of nitrogen replacement.
1 Scope:certification of nitrogen replacement.
2 Certification of the nitrogen replacement shall meet the requirements of Table 4.11.14.
Table 4.11.14 Certification of nitrogen replacement
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_626.jpg?sign=1738885780-NhTRCXwvkuHsmOZFdUfxgPQMef4aLK9a-0-c3a8ca717a8c8cb963385daf725197bd)
4.11.15 Erection of static mixer(AIG).
1 Scope:inspection and erection of static mixer(AIG)in denitrification devices.
2 Quality criteria and inspection methods are shown in Table 4.11.15.
Table 4.11.15 Erection of static mixer(AIG)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_627.jpg?sign=1738885780-ayoH0jx7A0p8PIPzX4CFxihCqTU8uKf8-0-c1b332c3d9bd95e5db24ccda03f65822)
Table 4.11.15(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_628.jpg?sign=1738885780-niVicomrYbhXTqdY8QlbRptTPy51iurp-0-bd15e9cd46a00f689eb2bb7d7c95eed6)
Table 4.11.15(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_629.jpg?sign=1738885780-9IIcj7vNOw7zm1mWeQEWcdogUlvA3kUb-0-0375f0f4d914a71a3db3a1570193edc4)
4.11.16 Implementation checklist of mandatory provisions of subsection project of reductant preparation and storage system.
1 Scope:implementation inspection of mandatory provisions of the subsection project of reductant preparation and storage system.
2 The implementation of mandatory provisions shall meet the requirements of Table 4.11.16.
Table 4.11.16 Implementation checklist of mandatory provisions of subsection project of reductant preparation and storage system
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_630.jpg?sign=1738885780-V88TzkvT13JwSldYiUbB0yec4gwhDVh6-0-f0c8de361f6a2cb6025066b9de9a33bd)
Table 4.11.16(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_631.jpg?sign=1738885780-F5TeIyvU7cMwDcsRYFjPnDee8wWVBS3D-0-f795eb5b314786614430af88ee1786cf)
Note:Contents in this Table may be added or deleted properly according to actual situations.