4.13 Thermal Equipment and Pipe Insulation of the Whole Plant
4.13.1 Fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper.
1 Scope:fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper.
2 Quality criteria and inspection methods are shown in Table 4.13.1.
Table 4.13.1 fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_677.jpg?sign=1738887934-dp0ANsS4mXlOqREZ19lfI7hU87zjf0S7-0-b6bbdc6d151124ff9388a7d6593c9464)
Table 4.13.1(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_678.jpg?sign=1738887934-TpuMtd9ouUrzEni5xOrOkZ5r36MFcQHR-0-3a944e95fdf794f91841113eb9f322ab)
4.13.2 Main insulation wet masonry and outer wall trowel finish surface construction of thermal equipment.
1 Scope:construction of main insulation wet masonry and outer wall trowel finish surface of thermal equipment.
2 Quality criteria and inspection methods are shown in Table 4.13.2.
Table 4.13.2 Construction of main lnsulation wet masonry and outer wall trowel finish surface of thermal equipment
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_679.jpg?sign=1738887934-ZzZ8kimwdrp7iBZvo3uDBiynn4AMYbuw-0-7825e4fdb5cfdd12310a23b596d70ce5)
Table 4.13.2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_680.jpg?sign=1738887934-42oHooh0NO1R9k0bwj9AQaeaC7upfiVl-0-831c06f42d021944d7344ae8ce2e276b)
4.13.3 Erection of main insulation masonry of thermal equipment and outer wall metal hood.
1 Scope:erection of main insulation masonry of thermal equipment and outer wall metal hood.
2 Quality criteria and inspection methods are shown in Table 4.13.3.
Table 4.13.3 Main insulation masonry of thermal equipment and erection of outer wall metal hood
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_681.jpg?sign=1738887934-tebvwwjptqVTQt560fEOYFgvqzuS3V5s-0-206830a1588c4c9afca9ad96bf8086b2)
Table 4.13.3(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_682.jpg?sign=1738887934-nW5sdU83HYIBazco4shKs6xyvH86DXBC-0-89f7f611993276bb1b50e3ebc59e4434)
4.13.4 Main insulation masonry(including air layer)of thermal equipment and erection of outer wall metal hood.
1 Scope:insulation of flue gas ducts,hot air ducts and cold air ducts.
2 Quality criteria and inspection methods are shown in Table 4.13.4.
Table 4.13.4 Main insulation masonry(including air layer)of thermal equipment and erection of outer wall metal hood
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_683.jpg?sign=1738887934-GkVPllzt9KhTfMhgO8ZcSJ1lV8jXpf8V-0-02ec2200c072d2116519d9b7c6d5df71)
Table 4.13.4(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_684.jpg?sign=1738887934-7Yv5Spkgyp9DkJQmHo0wHWIXg8GTO4Cx-0-f1fa03c82aca27c6138108a2e9bd570b)
4.13.5 Construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces.
1 Scope:construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces.
2 Quality criteria and inspection methods are shown in Table 4.13.5.
Table 4.13.5 Construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_685.jpg?sign=1738887934-FuO93ildsI47zCBugnk2uURzerlrZ8ir-0-9672bcbcc550fc1d5d4a953c9362858a)
Table 4.13.5(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_686.jpg?sign=1738887934-5WV61E7EhrwITUC9JDXcT43n6YKXNGhc-0-544b061f3ece96d23237b81a7987574c)
4.13.6 Main insulation masonry of thermal pipes and erection of outer wall metal hoods.
1 Scope:main insulation masonry of thermal pipes and erection of outer wall metal hoods.
2 Quality criteria and inspection methods are shown in Table 4.13.6.
Table 4.13.6 Main lnsulation masonry of thermal pipes and erection of outer wall metal hoods
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_687.jpg?sign=1738887934-k6uwwaf2yRPGl0zkOHgtMU4N1PzRG56d-0-d77fc0bc66db9c11bc77bfe66070b54f)
Table 4.13.6(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_688.jpg?sign=1738887934-YGg1RZLhBO4p2JggjX8Hrpf8cSPuILjw-0-7097ab0a1fcbf71cf00a9794359c7090)
4.13.7 Main insulation masonry of thermal main feed water,main steam,reheating steam pipes and erection of outer wall metal hoods.
1 Scope:main steam pipes,feed water pipe and reheating steam pipes.
2 Quality criteria and inspection methods are shown in Table 4.13.7.
Table 4.13.7 Main insulation masonry of thermal main feed water,main steam,reheating steam pipes and erection of outer wall metal hoods
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_689.jpg?sign=1738887934-t3bcYtTGG81vug1krpanBWO26GcE5rEB-0-fda611270e425d1fb01e50781d1305b9)
Table 4.13.7(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_690.jpg?sign=1738887934-ssCtaitXDFSyLJzlfFO56PYxdbJXHNJN-0-6bbecfa1a0f50241d17a397c33575dd5)
Table 4.13.7(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_691.jpg?sign=1738887934-h9fkbxL5GniDvLeFX86AH1QmqRnzaffn-0-fdd6ee40187c22e6c3242399e0c6f9ed)
Note:a—erection of a metal cover at any creep expansion measuring point shall be only applicable for main steam pipe and reheating steam heating section.
4.13.8 Steam turbine proper spraying and insulation.
1 Scope:steam turbine proper spraying and insulation.
2 Quality criteria and inspection methods are shown in Table 4.13.8.
Table 4.13.8 Steam turbine proper spraying and insulation
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_692.jpg?sign=1738887934-pJMcTptH4CxsYgxX6zxLLRmkSiv0yTd7-0-1b634945457069631ea6f5ce15e34971)
Table 4.13.8(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_693.jpg?sign=1738887934-ZE8EfEA2Omfc53RbP1VVruDU633Lghid-0-2efd6080b448fa2716b3b1b8fc6a0fa7)
4.13.9 Aluminum silicate fiber felt pasting lnsulation of steam turbine proper.
1 Scope:aluminum silicate fiber felt pasting insulation of steam turbine proper.
2 Quality criteria and inspection methods are shown in Table 4.13.9.
Table 4.13.9 Aluminum silicate fiber felt pasting lnsulation of steam turbine proper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_694.jpg?sign=1738887934-2exhQW5WhdHu9hTK6P8RxmYX2SVp4X85-0-a5eb5be42107da93a410e135f478623c)
4.13.10 Mineral fine fiber felt and board insulation of steam turbine proper.
1 Scope:mineral fine fiber felt and board insulation of steam turbine proper.
2 Quality criteria and inspection methods are shown in Table 4.13.10.
Table 4.13.10 Mineral fine fiber felt and board Insulation of steam turbine proper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_695.jpg?sign=1738887934-X48Yjd3Qkpr1V1yeFDwpbkZpVWY9NoLd-0-803d38cb6df95047adacf330a5a80f99)
4.13.11 Insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface.
1 Scope:insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface.
2 Quality criteria and inspection methods are shown in Table 4.13.11.
Table 4.13.11 Insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_696.jpg?sign=1738887934-3qbOKua4bYioZVJ8kH5yunvcE6dyn5u5-0-40ca56cb39dd080265e169bfa55ee4a7)
Table 4.13.11(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_697.jpg?sign=1738887934-bvB57bJ3QrGP5Mhqt3FaEfzRYRQ47q4D-0-b2ee632685b3fecabf47b744db27c7f3)
4.13.12 Insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes:
1 Scope:insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes.
2 Quality criteria and inspection methods are shown in Table 4.13.12.
Table 4.13.12 Insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_698.jpg?sign=1738887934-llrNAJoPkq6pChIWitsNMURbeHp9fnq8-0-083fcc23b7dfaaffff7c00943616739d)
4.13.13 FRP insulation sleeves of valves and flanges.
1 Scope:FRP insulation sleeves of valves and flanges.
2 Quality criteria and inspection methods are shown in Table 4.13.13.
Table 4.13.13 FRP insulation sleeves of valves and flanges
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_699.jpg?sign=1738887934-L41MH6LEtuPcU0G2wV0wxz9GV0AmBdXf-0-8778ed8c91ad22622a6108c7b37dc2da)
4.13.14 Insulation construction of metal shells of thermal equipment,pipe valves and flanges.
1 Scope:insulation construction of metal shells of thermal equipment,pipe valves and flanges.
2 Quality criteria and inspection methods are shown in Table 4.13.14.
Table 4.13.14 Insulation construction of metal shells of thermal equipment,pipe valves and flanges
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_700.jpg?sign=1738887934-hfBeUPpsd7eh51k2cYUf3lJ2EbwpnfIT-0-dcfb6de36b0ead7c4008eeba23c6c22c)
4.13.15 Certification of insulation material sampling and re-inspection.
1 Scope:insulation materials,insulation concrete materials and trowel finish surface materials.
2 The certification of insulation material sampling and re-inspection shall meet the requirements of Table 4.13.15.
Table 4.13.15 Certification of insulation material sampling and re-inspection
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_701.jpg?sign=1738887934-UBQ0iuuJyQNTUGnfViUCO6kOBhTTZhq0-0-fab30a87cc4699731dd8be4a9be641dc)
4.13.16 Measurement record of equipment and pipe surface temperature after insulation.
1 Scope:surface temperature measurement to boiler setting,furnace top setting,reheating steam pipes,main steam pipes and the feed water pipes after insulation.
2 The measurement record shall meet the requirements of Table 4.12.12.
4.13.17 Implementation inspection list of mandatory provisions.
1 Scope:implementation inspection of mandatory provisions on insulation subsection project of steam turbine equipment and pipes.
2 The implementation inspection of mandatory provisions shall meet the requirements of Table 4.13.17.
Table 4.13.17 Implementation inspection list of mandatory provisions
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_702.jpg?sign=1738887934-njYs9P8UVncV4hBWUmdTVw3umu9qzEmh-0-746922bdac581a719f5cb0137a145dd3)
Note:contents in this Table may be added or deleted properly according to actual situations.